Skip to content

Set order in wich eCash will be displayed with its special currency i…

5009c46
Select commit
Loading
Failed to load commit list.
Open

ecash integration #5513

Set order in wich eCash will be displayed with its special currency i…
5009c46
Select commit
Loading
Failed to load commit list.
Travis CI / Travis CI - Pull Request succeeded Mar 24, 2025 in 8m 56s

Build Passed

The build passed, just like the previous build.

Details

This is a pull request build.

It is running a build against the merge commit, after merging #5513 ecash integration .
Any changes that have been made to the develop branch before the build ran are also included.

Jobs and Stages

This build only has a single job.
You can use jobs to test against multiple versions of your runtime or dependencies, or to speed up your build.

Build Configuration

Build Option Setting
Language Node.js
Operating System Linux (Jammy)
Node.js Version 18
Build Configuration
{
  "language": "node_js",
  "os": [
    "linux"
  ],
  "dist": "jammy",
  "branches": {
    "only": [
      "develop",
      "staging"
    ]
  },
  "node_js": [
    "18"
  ],
  "before_install": [
    "node scripts/hack-travis.mjs"
  ],
  "install": [
    "yarn install --frozen-lockfile --network-concurrency 1",
    "yarn prepare"
  ],
  "script": [
    "yarn lint",
    "yarn tsc",
    "yarn test"
  ]
}