Skip to content

Conversation

@def-
Copy link
Contributor

@def- def- commented Dec 30, 2025

Seen in https://buildkite.com/materialize/nightly/builds/14592

Also needs https://github.com/MaterializeInc/i2/pull/3033

Checklist

  • This PR has adequate test coverage / QA involvement has been duly considered. (trigger-ci for additional test/nightly runs)
  • This PR has an associated up-to-date design doc, is a design doc (template), or is sufficiently small to not require a design.
  • If this PR evolves an existing $T ⇔ Proto$T mapping (possibly in a backwards-incompatible way), then it is tagged with a T-proto label.
  • If this PR will require changes to cloud orchestration or tests, there is a companion cloud PR to account for those changes that is tagged with the release-blocker label (example).
  • If this PR includes major user-facing behavior changes, I have pinged the relevant PM to schedule a changelog post.

@def- def- requested a review from a team as a code owner December 30, 2025 08:30
@def- def- force-pushed the pr-aws-ci branch 12 times, most recently from cf3331f to 42cf16d Compare December 30, 2025 14:02
@def- def- force-pushed the pr-aws-ci branch 2 times, most recently from c963e50 to 4b82de5 Compare December 30, 2025 14:18
@def- def- enabled auto-merge December 30, 2025 14:18
@def- def- disabled auto-merge December 30, 2025 14:19
@def- def- enabled auto-merge December 30, 2025 14:19
@def- def- merged commit f03880c into MaterializeInc:main Dec 30, 2025
131 checks passed
@def- def- deleted the pr-aws-ci branch December 30, 2025 14:28
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants